Before, after, and what it took. Every job shows the time on site and what was in the scope, because that is what you will want to know about yours.


Type: Extensions | Location: Harpenden | Time on site: 12 weeks
A 1930s semi with a cramped kitchen. We took the back wall out on a steel, built a four metre extension with a warm flat roof, and the family now cooks and eats in one room.


Type: Loft Conversions | Location: St Albans | Time on site: 8 weeks
A Victorian terrace that needed a fourth bedroom. A full width dormer gave the head height for a double bedroom with an en suite, and the stairs sit over the existing flight so no landing space was lost.


Type: Kitchens | Location: Radlett | Time on site: 5 weeks
Two small rooms made one. The dividing wall came out on a steel, the floor was levelled and a new kitchen fitted with the island where the wall used to be.


Type: Full Renovations | Location: Hatfield | Time on site: 16 weeks
A probate purchase that had not been touched since the seventies. Everything came out, the structure was repaired, and the house was rebuilt inside over four months to a programme agreed on day one.


Type: Bathrooms | Location: Watford | Time on site: 3 weeks
The family bathroom and a new en suite were built back to back so they share the plumbing stack. Underfloor heating and large porcelain tiles throughout.


Type: Garden and Outdoor | Location: Hitchin | Time on site: 4 weeks
A home office at the end of the garden and a patio that joins it to the house. The garden room is insulated for year round use and has its own consumer unit.