Please find below a list of the services we offer. Click on a service to jump to it: Extensions | Loft Conversions | Kitchens | Bathrooms | Full Renovations | Garden and Outdoor

More room for the kitchen, a place for the family to eat together, or a proper home office. We build extensions from the footings up, with one team on site from start to finish.
Most of the extensions we build are single storey rear or side return extensions on semis and terraces. We also take on double storey, wraparound and garage conversions where the house and the plot allow it.
You get a fixed written quote before anything starts, with the structural work, roofing, windows and doors, electrics, plumbing and plastering all itemised. If you want us to carry the project through to the finished kitchen or flooring, we will.
| 1. Site visit | We measure up, talk through what you want and look at access and drainage. |
|---|---|
| 2. Drawings and quote | Plans and a fixed itemised quote. You see every figure before you commit. |
| 3. Approvals | Planning or a lawful development certificate, then building control. |
| 4. The build | Groundworks, structure, roof, then the inside. One site manager throughout. |
| 5. Handover | Snagging walked through with you and the completion certificate issued. |
| Typical time on site | 10 to 16 weeks |
Q: Will I need planning permission?
A: Often not. A single storey rear extension can usually go up to 3 metres on a semi or terrace and 4 metres on a detached house under permitted development, with 6 and 8 metres possible through prior approval. We check your house and tell you straight.
Q: Can we stay in the house during the work?
A: Nearly all of our customers do. We keep the new build sealed off from the house for as long as we can, and plan the knock through for a day that suits you.
Q: How long does an extension take?
A: A typical single storey rear extension takes 10 to 14 weeks on site. Double storey and wraparounds take longer. Your quote comes with a programme.




An extra bedroom and bathroom without losing any garden. We convert lofts on Victorian terraces, 1930s semis and newer houses alike, and sort the structure, stairs and fire regulations properly.
The right type of loft depends on your roof. A rooflight conversion keeps the roof as it is. A rear dormer adds the most head height and floor space. Hip to gable suits semis and end terraces, and a mansard gives the most room where planning allows.
Every loft we build has a proper staircase, fire doors to the regulations, insulation to current standards and the steels designed by a structural engineer. The paperwork from building control comes to you at the end.
| 1. Survey | We check head height, roof structure and where the stairs can land. |
|---|---|
| 2. Design | Drawings for the dormer and stairs, plus the engineer's calculations. |
| 3. Approvals | Most lofts are permitted development. Building control is always needed. |
| 4. The build | Scaffold up, steels in, dormer built, then stairs, windows and the inside. |
| 5. Sign off | Building control final inspection and your completion certificate. |
| Typical time on site | 6 to 10 weeks |
Q: Does my loft have enough height?
A: You need around 2.2 metres from the top of the ceiling joists to the ridge for a comfortable conversion. We measure it on the first visit and tell you what is possible.
Q: Do I need planning permission for a loft?
A: Most lofts fall under permitted development, which allows up to 40 cubic metres on a terrace and 50 on a semi or detached house. Mansards and front dormers usually need planning, and conservation areas have their own rules.
Q: How long does a loft conversion take?
A: Six to ten weeks on site for most dormers. We work from the outside in, so the house stays dry and the mess stays upstairs.




A kitchen that works for how you cook and live. We handle the strip out, any wall removals, the electrics, plumbing and plastering, and fit the units, worktops and flooring to a proper finish.
Plenty of kitchen fitters only fit kitchens. We are builders, so we can take down the wall between the kitchen and dining room, move the sink to the other side, run the extraction properly and make good everything afterwards.
Bring us your kitchen design from your supplier of choice, or we can introduce you to the ones we work with. Either way you get one quote, one team and one person to call.
| 1. Measure | We survey the room and talk through layout, services and any walls to come down. |
|---|---|
| 2. Plan | You choose the units and finishes. We quote the building and fitting work. |
| 3. Strip out | Old kitchen out, walls removed, first fix electrics and plumbing. |
| 4. Fit | Plaster, units, worktops, tiling and flooring in the right order. |
| 5. Finish | Appliances connected, decorating done, snagging walked through. |
| Typical time on site | 2 to 6 weeks |
Q: Can you take the wall down between the kitchen and dining room?
A: Usually yes. If the wall is load bearing, a structural engineer designs the steel and we fit it. Building control signs it off.
Q: How long will I be without a kitchen?
A: A straightforward refit takes two to three weeks. With a wall removal and new flooring, allow four to six. We set up a temporary sink and worktop where we can.
Q: Do you supply the kitchen units?
A: We can fit units from any supplier. Many customers buy from a kitchen showroom or a trade supplier and we fit them. We are happy to recommend ones we trust.




Bathrooms that are watertight first and good looking second, in that order. Tanking, plumbing, electrics and tiling by one team who do this every week.
A bathroom involves more trades per square metre than any other room. We do the strip out, plumbing, electrics, plastering, tanking, tiling, fitting and decorating ourselves, so the joins between the jobs are done right.
We fit everything from a practical family bathroom to a full wet room with underfloor heating and a walk in shower. If you want a downstairs loo under the stairs, we can usually find the drainage.
| 1. Survey | We check the pipework, floor and ventilation and talk through the layout. |
|---|---|
| 2. Quote | A fixed price for the work. You choose the suite, tiles and fittings. |
| 3. Strip out | Old suite out, first fix plumbing and electrics, floor prepared. |
| 4. Tile and fit | Tanking, tiling, then the suite and shower go in. |
| 5. Finish | Sealed, decorated, cleaned and tested before we hand it back. |
| Typical time on site | 2 to 3 weeks |
Q: How long does a bathroom take?
A: Most bathrooms take two to three weeks. Wet rooms and layouts that move the drainage take a little longer.
Q: Can we add an en suite?
A: Often yes, if there is room for the drainage run. A corner of a large bedroom or part of the loft are the usual spots. We tell you what is possible on the survey.
Q: Who supplies the suite and tiles?
A: You choose them from any supplier. We give you the measurements and tell you how much tile to order, with the right amount of spare.




Bought a house that needs everything doing? We take renovations back to brick where needed and bring them up to date room by room, with a programme you can plan your life around.
A full renovation is where having a single team pays off. Rewiring, replumbing, new heating, damp work, replastering, new floors, kitchens, bathrooms and decorating all have to happen in the right order. We run the whole programme and keep you informed each week.
We are used to working on period properties where things are not square and surprises turn up behind the plaster. The quote sets out what is included and what we will do if we find something unexpected.
| 1. Walk round | We go through the house with you room by room and list what needs doing. |
|---|---|
| 2. Quote and programme | A fixed itemised quote with a week by week programme. |
| 3. Strip out | Back to a clean shell where needed. Structural and damp work first. |
| 4. First fix to finish | Services, plaster, joinery, kitchens, bathrooms, floors, decoration. |
| 5. Handover | Snagging, certificates and a tidy house ready to move into. |
| Typical time on site | 3 to 5 months |
Q: Should we live in the house during a renovation?
A: For a full renovation it is usually easier and quicker if the house is empty, and it works out cheaper. For smaller phased work we can work around you a floor at a time.
Q: How do you deal with surprises behind the walls?
A: We tell you the same day, show you, and price any extra work before doing it. Nothing is added to the bill without your say so.
Q: How long does a full renovation take?
A: A three bedroom house taken back to brick usually takes three to five months. The programme in your quote gives you the dates.




The outside done to the same standard as the inside. Patios laid on proper sub bases, garden rooms built to last, and walls and fencing that stay straight.
A patio is a building job. The difference between one that lasts and one that sinks is in the sub base, the falls and the drainage, none of which you can see once it is finished. We lay porcelain, sandstone and block paving with the groundwork done properly.
Garden rooms and outbuildings are built with insulated floors and walls so they are usable all year. We can run power and data out to them and connect them to the house.
| 1. Visit | We look at levels, drainage and access, and talk through what you want. |
|---|---|
| 2. Design and quote | A layout drawing and a fixed quote for the works. |
| 3. Groundwork | Dig out, sub base, drainage and any walls or footings. |
| 4. Build | Paving laid, structures built, services run. |
| 5. Finish | Pointing, cleaning and the garden put back together. |
| Typical time on site | 1 to 4 weeks |
Q: Do I need planning permission for a garden room?
A: Usually not. Outbuildings under 2.5 metres high within 2 metres of a boundary are permitted development in most gardens. We check before we quote.
Q: How long does a patio take?
A: A typical patio takes one to two weeks including the groundwork. Larger gardens with walls and steps take longer.
Q: Can you work in winter?
A: Yes. Groundwork and construction carry on in most weather. Pointing and some finishes wait for a dry spell.


